China Petroleum & Chemical Corp. (Sinopec) brought online its third 100-Bcm onshore field in the Sichuan Basin in China, the company announced March 14.
The West Sichuan Gas Field, part of the company’s Project Deep Earth in the Sichuan and Chongqing Natural Gas Base, is expected to produce 2 Bcm/year of natural gas and 130,000 tons of sulfur.
The West Sichuan Field features integrated gas extraction and desulfurization processes and natural gas sulfur recovery rates of over 99.9%, Sinopec said, and it produces gas that meets national standards with zero wastewater discharge.
Sinopec said it used engineering solutions for high yields with fewer wells to overcome challenges such as low porosity and permeability in the West Sichuan Field. Those innovations include an anti-collapse drilling fluid system and technologies for controlling borehole trajectories in ultra-deep wells over 8,000 m. Sinopec said the segmentation technology for ultra-long horizontal wells enhances productivity and reserves extraction of individual wells.
Since 2000, Sinopec has focused on exploring the Sichuan Basin, where it discovered the Puguang and Yuanba sour gas fields, both of which hold over 100 Bcm of reserves. In August, it announced finding 30.6 Bcm of gas at the Bazhong Field in the basin.
Recommended Reading
The Need for Speed in Oil, Gas Operations
2024-03-22 - NobleAI uses “science-based AI” to improve operator decision making and speed up oil and gas developments.
Tech Trends: SLB's Autonomous Tech Used for Drilling Operations
2024-02-06 - SLB says autonomous drilling operations increased ROP at a deepwater field offshore Brazil by 60% over the course of a five-well program.
TotalEnergies Starts Production at Akpo West Offshore Nigeria
2024-02-07 - Subsea tieback expected to add 14,000 bbl/d of condensate by mid-year, and up to 4 MMcm/d of gas by 2028.
Well Logging Could Get a Makeover
2024-02-27 - Aramco’s KASHF robot, expected to deploy in 2025, will be able to operate in both vertical and horizontal segments of wellbores.
Shell Brings Deepwater Rydberg Subsea Tieback Onstream
2024-02-23 - The two-well Gulf of Mexico development will send 16,000 boe/d at peak rates to the Appomattox production semisubmersible.